{"id":20757,"date":"2026-02-28T10:22:59","date_gmt":"2026-02-28T09:22:59","guid":{"rendered":"https:\/\/www.bfpgroup.net\/final-acceptance-achieved-performance-exceeded\/"},"modified":"2026-06-08T12:04:26","modified_gmt":"2026-06-08T11:04:26","slug":"final-acceptance-achieved-performance-exceeded","status":"publish","type":"post","link":"https:\/\/www.bfpgroup.net\/it\/final-acceptance-achieved-performance-exceeded\/","title":{"rendered":"Final Acceptance achieved. Performance exceeded."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Two years after Provisional Acceptance (PAC), the Final Acceptance Certificate for the 1 MWp photovoltaic plant in Alliste (LE) \u2014 delivered by BFP Service under a Full EPC contract \u2014 has officially been signed.<br\/>The outcome speaks clearly:<\/p>\n\n<p class=\"wp-block-paragraph\">The plant achieved a Performance Ratio more than 1.5% above the guaranteed PR.<br\/>Full satisfaction from all parties involved.<br\/>A plant that has consistently delivered strong and stable production.<\/p>\n\n<p class=\"wp-block-paragraph\">For us, this milestone goes beyond contractual compliance.<\/p>\n\n<p class=\"wp-block-paragraph\">In the renewable energy sector, real value is generated over time.<br\/>The reliability of an EPC Contractor is not tested only during construction \u2014 it is proven in long-term performance.<\/p>\n\n<p class=\"wp-block-paragraph\">Delivering on time is expected.<br\/>Delivering plants that outperform guarantees is what builds trust.<\/p>\n\n<p class=\"wp-block-paragraph\">This result confirms that rigorous engineering, accurate design assumptions and high construction standards directly translate into lower risk and stronger returns for investors.<\/p>\n\n<p class=\"wp-block-paragraph\">At BFP Service, we measure success in megawatt-hours \u2014 not only in milestones.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two years after Provisional Acceptance (PAC), the Final Acceptance Certificate for the 1 MWp photovoltaic plant in Alliste (LE) \u2014 delivered by BFP Service under a Full EPC contract \u2014 has officially been signed.The outcome speaks clearly: The plant achieved a Performance Ratio more than 1.5% above the guaranteed PR.Full satisfaction from all parties involved.A [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":20649,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[44,33],"tags":[],"class_list":["post-20757","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-progetti-bfp-service-it","category-senza-categoria"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/20757","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/comments?post=20757"}],"version-history":[{"count":1,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/20757\/revisions"}],"predecessor-version":[{"id":20758,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/20757\/revisions\/20758"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/media\/20649"}],"wp:attachment":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/media?parent=20757"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/categories?post=20757"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/tags?post=20757"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}