{"id":20098,"date":"2010-04-19T15:55:12","date_gmt":"2010-04-19T13:55:12","guid":{"rendered":"https:\/\/www.bfpgroup.net\/19th-april-2010-financed-aes-solar-energy-s-new-43mw-photovoltaic-plant-in-cellino-san-marco-designed-by-bfp\/"},"modified":"2010-04-19T15:55:12","modified_gmt":"2010-04-19T13:55:12","slug":"19th-april-2010-financed-aes-solar-energy-s-new-43mw-photovoltaic-plant-in-cellino-san-marco-designed-by-bfp","status":"publish","type":"post","link":"https:\/\/www.bfpgroup.net\/it\/19th-april-2010-financed-aes-solar-energy-s-new-43mw-photovoltaic-plant-in-cellino-san-marco-designed-by-bfp\/","title":{"rendered":"19th April 2010 \u2013 Financed AES Solar Energy\u2019s new 43MW photovoltaic plant in Cellino San Marco, designed by BFP"},"content":{"rendered":"<div style=\"text-align: justify;\">19<sup>th<\/sup> April 2010 \u2013 Near Cellino San Marco in (Brindisi), a <b>43 MW photovoltaic power plant conceived and designed by BFP, which is currently responsible for works supervision and safety coordination<\/b>, will be operational by the end of the year. The plant, authorized by the Region of Apulia and already in the process of construction, is owned by a subsidiary of AES Solar Energy, a joint venture between The AES Corporation and Riverstone Holdings LLC, which announced that it has received \u20ac 173 million in financing to complete the project. The plant represents the largest photovoltaic project in Italy to have reached financial closing.<\/div>\n<p>  <!--more-->  <\/p>\n<div style=\"text-align: justify;\">The Cellino San Marco 43MW, the first in Italy by AES Solar, will double its global operating portfolio, which currently includes 38MW across France, Greece and Spain.<\/p>\n<\/div>\n<div style=\"text-align: justify;\">Download  the AES ufficial press release.<\/div>\n","protected":false},"excerpt":{"rendered":"<p>19th April 2010 \u2013 Near Cellino San Marco in (Brindisi), a 43 MW photovoltaic power plant conceived and designed by BFP, which is currently responsible for works supervision and safety coordination, will be operational by the end of the year. The plant, authorized by the Region of Apulia and already in the process of construction, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[33],"tags":[],"class_list":["post-20098","post","type-post","status-publish","format-standard","hentry","category-senza-categoria"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/20098","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/comments?post=20098"}],"version-history":[{"count":0,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/20098\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/media?parent=20098"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/categories?post=20098"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/tags?post=20098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}