{"id":19938,"date":"2019-11-05T17:08:04","date_gmt":"2019-11-05T16:08:04","guid":{"rendered":"https:\/\/www.bfpgroup.net\/hs-supervision-and-quality-control-on-a-18-mwp-pv-plant-in-volpiano-to-belonging-to-eny-new-energy\/"},"modified":"2019-11-05T17:08:04","modified_gmt":"2019-11-05T16:08:04","slug":"hs-supervision-and-quality-control-on-a-18-mwp-pv-plant-in-volpiano-to-belonging-to-eny-new-energy","status":"publish","type":"post","link":"https:\/\/www.bfpgroup.net\/it\/hs-supervision-and-quality-control-on-a-18-mwp-pv-plant-in-volpiano-to-belonging-to-eny-new-energy\/","title":{"rendered":"H&#038;S SUPERVISION AND QUALITY CONTROL ON A 18 MWp PV PLANT IN VOLPIANO (TO) BELONGING TO ENI NEW ENERGY"},"content":{"rendered":"<p>BFP is technical advisor for a 18MWp Photovoltaic Plant located in Volpiano (TO), suppling H&amp;S Supervision\u00a0 during Construction and Quality Control.<\/p>\n<p>The project involves the construction of two photovoltaic plants, \u201cVolpiano 1\u201d and \u201cVolpiano 2\u201d, on a total area of 34.1 hectares, with the installation of latest-generation photovoltaic panels mounted on fixed structures.<\/p>\n<p><em>\u201cWe are very honoured to work with such an international player in the energy production like ENI\u201d,<\/em> Danilo Pomponio, co-owner of BFP, declared. <em>\u201cI take this opportunity to thank BFP&#8217;s HSEQ team for their excellent work. Thanks guys!\u201d<\/em><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/bfpgroup.net\/wp-content\/uploads\/2019\/11\/foto.jpg\" rel=\"nofollow noopener\" target=\"_blank\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-medium wp-image-14986\" src=\"https:\/\/bfpgroup.net\/wp-content\/uploads\/2019\/11\/foto-300x197.jpg\" alt=\"\" width=\"300\" height=\"197\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BFP is technical advisor for a 18MWp Photovoltaic Plant located in Volpiano (TO), suppling H&amp;S Supervision\u00a0 during Construction and Quality Control. The project involves the construction of two photovoltaic plants, \u201cVolpiano 1\u201d and \u201cVolpiano 2\u201d, on a total area of 34.1 hectares, with the installation of latest-generation photovoltaic panels mounted on fixed structures. \u201cWe are [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[33],"tags":[],"class_list":["post-19938","post","type-post","status-publish","format-standard","hentry","category-senza-categoria"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/19938","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/comments?post=19938"}],"version-history":[{"count":0,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/19938\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/media?parent=19938"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/categories?post=19938"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/tags?post=19938"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}