{"id":19900,"date":"2020-12-02T12:51:27","date_gmt":"2020-12-02T11:51:27","guid":{"rendered":"https:\/\/www.bfpgroup.net\/bfp-is-proud-to-be-present-in-a-new-project-of-erg-spa-namely-the-reblading-of-a-wind-farm-in-lacedonia-monteverde-campania-consisting-of-60-v47-wind-turbines-which-came-into-operation-in-2000\/"},"modified":"2025-09-22T15:22:44","modified_gmt":"2025-09-22T14:22:44","slug":"bfp-is-proud-to-be-present-in-a-new-project-of-erg-spa-namely-the-reblading-of-a-wind-farm-in-lacedonia-monteverde-campania-consisting-of-60-v47-wind-turbines-which-came-into-operation-in-2000","status":"publish","type":"post","link":"https:\/\/www.bfpgroup.net\/it\/bfp-is-proud-to-be-present-in-a-new-project-of-erg-spa-namely-the-reblading-of-a-wind-farm-in-lacedonia-monteverde-campania-consisting-of-60-v47-wind-turbines-which-came-into-operation-in-2000\/","title":{"rendered":"BFP is proud to be present in a new project of ERG Spa, namely the Reblading of a Wind Farm in Lacedonia\/Monteverde (Campania), consisting of 60 V47 wind turbines, which came into operation in 2000."},"content":{"rendered":"<p>For this project, BFP carried out the activities of Coordination in the Design and Execution Phase (CSP-CSE) and Head of the Works (RL), through the careful and scrupulous work of <strong>Danilo Pomponio<\/strong>, BFP Co-Founder, and <strong>Lucrezia Forastiere, <\/strong>HSEQ Manager of BFP.<\/p>\n<p>&#8220;We are very pleased to work with ERG, with whom we have a continuous collaboration&#8221;, Danilo Pomponio declares, &#8220;And, for this reason, I thank <strong>Lucrezia Forastiere<\/strong> for her constant and valuable work, together with the whole HSEQ Team, <strong>Christian Catacchio<\/strong>, <strong>Fabio Somma,<\/strong> and our R.S.P.P. <strong>Angela Traversa<\/strong>, for their precious support, that make up a winning team\u201d.<\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/bfpgroup.net\/wp-content\/uploads\/2020\/12\/0.jpg\" rel=\"nofollow noopener\" target=\"_blank\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-medium wp-image-15422\" src=\"https:\/\/bfpgroup.net\/wp-content\/uploads\/2020\/12\/0-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\"><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>For this project, BFP carried out the activities of Coordination in the Design and Execution Phase (CSP-CSE) and Head of the Works (RL), through the careful and scrupulous work of Danilo Pomponio, BFP Co-Founder, and Lucrezia Forastiere, HSEQ Manager of BFP. &#8220;We are very pleased to work with ERG, with whom we have a continuous [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49,33],"tags":[],"class_list":["post-19900","post","type-post","status-publish","format-standard","hentry","category-post-studio-tecnico-it","category-senza-categoria"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/19900","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/comments?post=19900"}],"version-history":[{"count":0,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/19900\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/media?parent=19900"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/categories?post=19900"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/tags?post=19900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}