{"id":19884,"date":"2024-06-12T14:47:00","date_gmt":"2024-06-12T13:47:00","guid":{"rendered":"https:\/\/www.bfpgroup.net\/completing-the-last-pile-for-a-6-mwp-photovoltaic-plant-in-mazara-del-vallo-sicily\/"},"modified":"2025-09-22T14:02:12","modified_gmt":"2025-09-22T13:02:12","slug":"completing-the-last-pile-for-a-6-mwp-photovoltaic-plant-in-mazara-del-vallo-sicily","status":"publish","type":"post","link":"https:\/\/www.bfpgroup.net\/it\/completing-the-last-pile-for-a-6-mwp-photovoltaic-plant-in-mazara-del-vallo-sicily\/","title":{"rendered":"Driving success: Completing the last pile for a 6 MWp photovoltaic plant in Mazara del Vallo, Sicily \u2014 built in under three months!"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In this foto, we are driving the last pile of a photovoltaic plant in Sicily, in Mazara del Vallo, which we are building \u2014 6 MWp of capacity \u2014 in less than three months. Record timing that involved all of us in a new challenge, as we took care of the entire plant: civil, electrical, and mechanical works.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We\u2019re also welcoming our first pile driver, proudly made by BFP SERVICE, which from this project has become part of the services we offer our clients.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A special thanks goes to our superheroes who are making a small miracle happen in record time! The company couldn&#8217;t achieve these results without you!<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"467\" height=\"1000\" src=\"https:\/\/www.bfpgroup.net\/wp-content\/uploads\/2025\/06\/Battipalo-res.jpg\" alt=\"\" class=\"wp-image-18543\" srcset=\"https:\/\/www.bfpgroup.net\/wp-content\/uploads\/2025\/06\/Battipalo-res.jpg 467w, https:\/\/www.bfpgroup.net\/wp-content\/uploads\/2025\/06\/Battipalo-res-140x300.jpg 140w\" sizes=\"(max-width: 467px) 100vw, 467px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>In this foto, we are driving the last pile of a photovoltaic plant in Sicily, in Mazara del Vallo, which we are building \u2014 6 MWp of capacity \u2014 in less than three months. Record timing that involved all of us in a new challenge, as we took care of the entire plant: civil, electrical, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19794,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[44,33],"tags":[],"class_list":["post-19884","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-progetti-bfp-service-it","category-senza-categoria"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/19884","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/comments?post=19884"}],"version-history":[{"count":0,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/posts\/19884\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/media\/19794"}],"wp:attachment":[{"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/media?parent=19884"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/categories?post=19884"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bfpgroup.net\/it\/wp-json\/wp\/v2\/tags?post=19884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}